Purpose-built for logistics and distribution buildings with long runs of identical loading docks. The spring package arrives pre-assembled from the factory instead of being pieced together on site — work that is normally done at heights above 3 metres — cutting assembly time by up to 40%. In practice, that means five doors installed per day instead of three.
Panels are packed three doors to a pallet, with tracks and motors packed separately, so installation crews work efficiently and packaging waste drops. The steel cables run directly from the bottom console to the cable drum for a cleaner, safer layout.


